skip to Main Content

Request design assistance

The following information is required to provide a recommendation for a simple run of trench drainage. On receipt of this form, ACO will provide a recommendation with hydraulic calculations where necessary.

For more complex layout please contact ACO .

CATCHMENT HYDRAULICS

Left (m)

Right (m)

such as downpipes, machinery etc. (l/s)

TRENCH DRAIN INFORMATION

A (m)

B (m)

Please select

OTHER INFORMATION

Trench hydraulic flow informationGrating intake performaceLayout schedule and parts listSurface water storage solutionsPlease contact me to discuss

ADDITIONAL RUNS

Run 2

years

Left (m)

Right (m)

such as downpipes, machinery etc. (l/s)

A (m)

B (m)

Please select

Run 3

years

Left (m)

Right (m)

such as downpipes, machinery etc. (l/s)

A (m)

B (m)

Please select

Run 4

years

Left (m)

Right (m)

such as downpipes, machinery etc. (l/s)

A (m)

B (m)

Please select

Run 5

years

Left (m)

Right (m)

such as downpipes, machinery etc. (l/s)

A (m)

B (m)

Please select

Trench Size
Expected Rainfall
Catchment Slope Crossfall
Trench Central To Catchment
Trench Central To Catchment
Outlet Position
Trench Drain Run Same Length As Catchment Area
Table Of Load Class Classification
Stormwater Storage Tank
Back To Top